Wood needs cutting to size, priming, and painting. The paint is sample pots of "Licorice" colour in the chalky finish -
I was really enjoying the way the white turned black.Next, drilling for the screws - SA/C/DC/E checks that I've done it right -
As it will be taken apart (easier to carry on public transport), I've numbered the corners for accurate reassembly -
It'll need wiping down and some touching up when reassembled.The plywood will support the foamcore, which will extend 20cm beyond the base -
From this angle, it looks suitably scary -
The legs are 110cm high - and it hardly wobbles at all (at the moment).
1 comment:
I love the instillation of the boots under the "stair instillation table".
Good luck!
Sandy
Post a Comment